Month 2010-1 January
Meeting of 2010-1-26 Regular Meeting
ON JANUARY 26 THERE WAS A SPECAIL MEETING HELD BEFORE THE
REGULAR SCHEDULED COUNCIL MEETING.
MINUTES
LAWTON CITY COUNCIL SPECIAL MEETING
JANUARY 26, 2010 5:00 P.M.
WAYNE GILLEY CITY HALL COUNCIL CHAMBER
Mayor John P. Purcell, Jr. Also
Present:
Presiding Larry
Mitchell, City Manager
Frank
Jensen, City Attorney
Traci
Hushbeck, City Clerk
Mayor Purcell called the meeting to order at 5:01 p.m. Notice of meeting and agenda
were posted
on the City Hall notice board as required by law.
ROLL CALL
PRESENT: James
Hanna, Ward Two
Janice Drewry, Ward Three
Jay Burk, Ward Four
Robert Shanklin, Ward Five
Richard Zarle, Ward Six
Stanley Haywood, Ward Seven
Doug
Wells, Ward Eight
ABSENT: Bill
Shoemate, Ward One
1. Discuss possible funding options for CJHS Restoration
Project. Exhibits:
Meyer Architecture Cost Estimates, First through Third Floor Phases.
Mitchell stated this presentation will be broken down into two parts. He has
asked Meyer
Architects to walk through the balance of the project. Phases I and II have been completed and
the City of Lawton has taken over the operation and maintenance responsibilities from the
Lawton Public Schools so we are now paying utilities and property insurance. They currently
have two grants pending, one for $250,000 for the west parking lot and one for $900,000 for an
energy retrofit.
Gary Armbruster, M. A. Architecture, stated he has been the architect on this project
for a
number of years. He distributed a packet of his presentation. The atrium which is
phase I is
complete. Phase II is complete minus a few minor things. He stated they are really here
to talk
about phase III. He stated even after phase III is complete, there is a lot of other square footage
in the building.
Mr. Armbruster presented a series of floor plans to the City Council. He distributed
a cost
estimate analysis. He stated the base bid which encompasses planning, revenue services and
licenses and permit is $1,890,000. He stated these numbers come from previous bids. He took
the high numbers from those bids. The good news is that these were done two or three years ago
at a time when you had to beg contractors to even bid your project because everyone was busy at
that time. The prices of steel and copper were through the roof. All of this has changed
and now
there is a lot of competition. Many of the projects he has worked on have come in considerably
under budget over the past year. Alternate one which is the conference center and catering
kitchen comes in at $595,000. Alternate two, the auditorium, comes in at $1,190,000 and
alternate three, auditorium lobby and conference rooms come in at $500,000. Total construction
is $4,175,000. Fixtures, furniture and equipment is $417,500. Architectural engineering fees are
based on total project cost at $292,250. Contingency is $417,500. A grant total of the entire
project is $5,302,250. There is still about 15,000 square feet of renovation after this to deal
with
and those have been priced out.
Shanklin questioned how much money we have spent so far.
Mitchell stated approximately $10 million.
Shanklin stated we started off with a $13 million project.
Mitchell stated the original estimate was about $12 million and that was in 2003-2004.
Mr. Armbruster stated the whole project cost is around $18 million to do all floors.
Burk questioned how much the project cost per square foot.
Mayor Purcell stated $181 per square foot.
Mr. Armbruster stated you could not build a new city hall of this size for this kind
of money. It
would be $250 or $300 a square foot.
Mitchell stated if the City Council agrees that staff should move forward with the
base bid and
the three alternates that are outlined, he stated there an outline from Wells Nelson and Associates
on how they may be able to pay for phase III of the project. They are trying to break the project
into pieces A & B and a C & D piece. Pieces A & B would cost just over $3 million and they
think they can pay for the majority of that through remaining funds from the 2000 CIP program.
They have talked about folding the 2000 CIP into the 2005 CIP. There is one outstanding
project in the 2000 CIP. Past practice has been when projects are completed the remaining funds
get folded into the next CIP program and the Council reallocates those dollars. They think they
have about $950,000 in cash in the 2000 CIP program and about $1.3 million left in a street
project that they designated in the 2000 CIP which was west Gore. When the Council approved
the 2000 CIP program, the idea was to put enough money into the west Gore project to cover the
City s local match to an ODOT funded program, so there was never enough money to do the
whole project. It is obvious to him that after ten years the Gore project is not going to get
high
enough priority from ODOT to get funding. In September 2001, the City reallocated about $1.3
million from the west Gore project to the Medicine Park water treatment plant to help fund a
project. He stated the City Council could use those remaining 2000 CIP funds which would
provide about $2.3 million in cash to help fund the base bid and one of the alternatives. The
other $683,000 would be combined with a short term bridge loan which would carry them
between now and the next CIP which will be in 2012. They are looking at funding about $3
million through an 18 month bridge loan. With the bridge loan they will be accelerating
the
project and saving the cost of inflation and consolidation of departments. He stated under the
Buy America Bonds program they can save about 1/3 of the interest rather than work with local
banks. He stated other options are assets that the City owns which would include the current city
hall and 40-50 acres on Rogers Lane and 67
th Street which has some considerable value. He
stated selling of property is something that cannot be done quickly and would be very time
consuming. He has also submitted grant requests to several foundations, but has not been
successful. He stated they could also start a local fundraising campaign or simply wait until the
2012 CIP to finance the improvements. He stated they could cut this down and only finish up the
north wing and the conference center which would be about $2.5 to $3 million. There are all
types of variations.
Drewry stated if they worked on the 2000 CIP funds and the short term bridge financing,
in the
mean time could they go ahead and try to sell that property on Rogers Lane.
Mitchell stated they could pay off the loan early. He stated they are not asking
for any action
tonight, we know we need about $8 million to complete the building. They need to move
forward with the north wing in order to vacate current city hall. He stated they are paying for
utilities and the cost of maintenance in the new building.
Zarle stated we have approximately $2.3 million right now without going into any
debt.
Mayor Purcell stated we need $5.3 million to get everyone out of current city hall.
Wells stated they have $3.2 million in the bank right now.
Mitchell stated yes, but there is one project that is still outstanding which is
the building at the
landfill. You would have to subtract that building out and the balance is $2.3 million.
Wells questioned if they could defer that project until 2012.
Mitchell stated that is an option for Council to decide.
Wells stated he read there was a delay on that project and it would be another year
before they
can even get the permit to get it started.
Mayor Purcell stated they have $2.3 million in the bank, and they need another three
million.
They need to give the City Manager some guidance on where they want him to go to get the
other three million.
Wells stated it will be at least a year before they will be ready to even start building
at the
landfill. They could talk about using that money and do something else later. That would
give
them $3.2 million.
Shanklin questioned if they even had a location for this building.
Jerry Ihler, Public Works Director, stated they have a location on the south side
of Tinney Road.
Mitchell stated the base bid would allow them to move out of the current city hall. The three
alternates allow them to do the auditorium, conference center and lobby so they can start using it
as a community building. He stated there is a good environment to go out and
do the base bid
with the alternates to see how they get those projects priced out.
Zarle questioned if they know of anyone interested in the parcel of land.
Mitchell stated he has not heard of anyone.
Mayor Purcell stated there was a group that had discussed buying or leasing the land
that the
current city hall sits on and taking in the whole area to the south to include the Armed Services
YMCA, when they move. It would be turned into a youth center. He has not heard anything
more about this in six months.
Wells questioned if the plans were complete and ready to go out for bids.
Mitchell stated they are 95% complete.
Mr. Armbruster stated if they are talking about this phase, then a lot of it is done.
Wells questioned how long it would take to get ready to go out for bids.
Mr. Armbruster stated about two to three months. Bidders would have thirty
days to respond.
Wells stated they were talking about five months before they could award bids. He
questioned
how long for the construction.
Mr. Armbruster stated twelve to sixteen months.
Wells stated they have money to get started and they will probably be in the 2012
CIP program
by the time they will really have to start using more money than what is available.
Mayor Purcell stated they cannot let the bid until all of the money is available,
so they will have
to figure out where the other $2 million or $3 million will come from. He stated the longer they
wait the price will be higher.
Wells stated fortunately the prices have dropped in the last couple of years.
Shanklin questioned if we were going to get any additional help from the McMahon
Foundation.
He stated that well may be dry.
Mitchell stated if they go out to bid for the $5 million, he is hoping that someone
might make a
significant donation in the next eighteen months or two years that may want the auditorium
named after them.
Mayor Purcell stated from what he is hearing, everyone wants to move forward with
the $5.3
which is the base bid and the three alternatives. He stated we have $2.3 million in the bank. He
stated the question is if they want to take the $900,000 from the building at the landfill. He
stated they need to give the City Manager some guidance.
Shanklin stated they have not needed that building at the landfill for the past ten
years. He
suggested they move the $900,000 and use it.
Mayor Purcell stated they now would need $2.1 million.
Hanna stated they need to look at the bridge loan.
Burk stated he agrees they need to use the $900,000 and then look at a bridge loan
for the
remainder.
Mitchell stated they estimate the bridge loan would cost approximately $200,000 in
interest for
eighteen months.
Wells questioned if that would be a low interest loan.
Keith McDonald, Wells Nelson & Associates, stated the bridge loan connects to
a couple
different directions. They could go to a local bank or go through the Buy America Bonds. The
intent of the bridge loan is to get to the 2012 CIP.
Wells stated we may be able to find a cheaper interest rate.
Mayor Purcell stated that the bids may come in a little cheaper.
Zarle stated we have millions of dollars sitting out there with 2
nd Street and everything else and
we need to watch what we are doing with the economy.
Wells stated he agrees, but we have already spent $8 million.
Drewry stated she would like to see them get this going as soon as possible.
Mitchell stated they also had an estimate of approximately $200,000 to move which
would
include IT improvements, the actual move, utilities, janitorial services, etc. He stated he does
believe they can cut that number down to around $120,000 - $150,000, but they are still working
on this piece to make the initial move sometime this year.
Wells questioned if they could save enough out of the petroleum account.
Mitchell stated they are hesitant to start borrowing from the current year budget
at this point.
There being no further business to consider, the meeting adjourned at 5:50 p.m. upon
motion,
second and roll call vote.
____
/s/ John P. Purcell, Jr.______________
JOHN P. PURCELL, JR., MAYOR
ATTEST:
____
/s/ Traci Hushbeck________________
TRACI HUSHBECK, CITY CLERK
MINUTES
LAWTON CITY COUNCIL REGULAR MEETING
JANUARY 26, 2010 6:00 P.M.
WAYNE GILLEY CITY HALL COUNCIL CHAMBER
Mayor John P. Purcell, Jr. Also
Present:
Presiding Larry
Mitchell, City Manager
Frank
Jensen, City Attorney
Traci
Hushbeck, City Clerk
COL Ray Lacey, Fort Sill Liaison
Mayor Purcell called the meeting to order at 6:10 p.m. Notice of meeting and agenda
were posted
on the City Hall notice board as required by law. Invocation was given by Mayor Purcell,
followed by the Pledge of Allegiance.
ROLL CALL
PRESENT: James
Hanna, Ward Two
Janice Drewry, Ward Three
Jay Burk, Ward Four
Robert Shanklin, Ward Five
Richard Zarle, Ward Six
Stanley Haywood, Ward Seven
Doug
Wells, Ward Eight
ABSENT: Bill
Shoemate, Ward One
AUDIENCE PARTICIPATION: None.
CONSIDER APPROVAL OF MINUTES OF LAWTON CITY COUNCIL REGULAR
MEETINGS OF DECEMBER 15, 2009 AND JANUARY 12, 2010.
MOVED by Drewry, SECOND by Hanna, to approve the minutes of December 15, 2009 and
January 12, 2010. AYE: Shanklin, Zarle, Haywood, Wells, Hanna, Drewry, Burk. NAY: None.
MOTION CARRIED.
CONSENT AGENDA: The following items are considered to be routine by the City Council
and
will be enacted with one motion. Should discussion be desired on an item, that item will be
removed from the Consent Agenda prior to action and considered separately.
Mayor Purcell stated they need to strike item #12.
MOVED by Drewry, SECOND by Burk, to approve the Consent Agenda with the exception of
item #12. AYE: Zarle, Haywood, Wells, Hanna, Drewry, Burk, Shanklin. NAY: None.
MOTION CARRIED.
1. Consider the following damage claims recommended for approval
and consider passage
of the resolutions authorizing the City Attorney to file a friendly suit for the
claims which are
over $400.00: Donna Apauty, Sheldon Bennett and Sarah Bennett in the amount of $2,400.00
(Res. 10-07), Ralph and Steven Baker in the amount of $9,169.69 (Res. 10-08), Department
of
Army in the amount of $89.01 and Travis Kennard and Donna Apauty in the amount of
$4,102.00 (Res. 10-09). Exhibits: Legal Opinion/Recommendation, Resolution No._____,
Resolution No.____, and Resolution No.____.
2. Consider adopting a resolution ratifying the action of
the City Attorney and the City
Manager in directing our third party administrator to make payment on the judgment in the
Workers' Compensation case of Paul Caldwell in the Workers' Compensation Court, Case No.
2008-02748L. Exhibits:
Resolution No. 2010-10.
3. Consider adopting a resolution ratifying the action of
the City Attorney and the City
Manager in directing our third party administrator to make payment on the judgment in the
Workers' Compensation case of Bobby W. Tomah in the Workers' Compensation Court, Case
No. 2009-10719K. Exhibits:
Resolution No. 2010-11.
4. Consider accepting State Aid for Libraries grant of $57,927
from the Oklahoma Department
of Libraries for FY 2009-2010. Exhibits: State Aid agreement on file in the City Clerk s
office.
5. Consider approving contracts for Children
s Art Studio , Spring 2010 semester for Steven
Scott Smith ($ 684), Kenneth Hobbs ($ 324), Sandra Dunn ($ 600) and Erica Barnes ($ 270)
instructors for the program. Total amount for the spring semester stipends is $ 1,878.00.
Exhibits: Contracts on file in City Clerk s office.
6. Consider approving request from the Arts & Humanities
Division to pursue applying for a
Local Government Challenge Grant from the Oklahoma Arts Council for FY 2010-11. Exhibits:
None.
7. Consider adopting a Resolution authorizing the City of
Lawton to apply for a grant from the
Oklahoma Strategic Military Planning Commission, through the Department of Commerce, in the
amount of $237,000 for improvements to US-62 (Rogers Lane) at Sheridan Road and Fort Sill
Boulevard, City of Lawton, and authorize the Mayor and City Clerk to execute all necessary
documentation. Exhibits:
Resolution 10-12, Letter from Oklahoma Department of
Transportation dated May 14, 2009, Proposed estimate of City of Lawton Costs for the Projects
and Oklahoma Strategic Military Planning Commission Grant Application Form.
8. Consider accepting a warranty deed from Whataburger Real
Estate LP and a permanent
utility easement from James and Shirley Winfrey for right of way needed for the NW 67
th Street
Reconstruction (Cache Road/Rogers Lane) Project #2003-7, authorizing the Mayor and City
Clerk to execute the instruments and authorizing payments for same. Exhibits: Warranty deed
and easement are on file in the City Clerk's office.
9. Consider approving the record plat for the Replat of Lot
1, Willow Park. Exhibits: Plat Map.
10. Consider authorizing staff to re-advertise the Intermodal
Transportation Museum Project
(F.A. Project No. STP-116E(130)EH) for bid following approval by the Oklahoma Department
of Transportation. Exhibits: Project Site Plan. Plans and specifications
are on file in the
Planning Division office.
11. Consider extending the contract (CL08-041) Self-Contained
Breathing Apparatus (SCBA)
from Wayest Safety of Oklahoma City, OK. Exhibits: Department Recommendation, Price
Sheet, Contract Extension Form.
12. Consider extending the contract (CL07-033) Nuisance Abatement-East
side from Charlie s
Backhoe of Sterling, Oklahoma. Exhibits: Department Recommendation, Price Sheet, Contract
Extension Form.
THIS ITEM WAS STRICKEN FROM THE AGENDA.
13. Consider extending the contract (RFPCL09-039) Cellular
Telephone Service from US
Cellular of Tulsa, OK. Exhibits: Department Recommendation, Price Sheet, Contract Extension
Form.
14. Consider extending the contract (CL08-044) Wrecker Service
from Priest Brothers of
Lawton, OK. Exhibits: Department Recommendation, Price Sheet, Contract Extension
Form.
15. Consider extending the contract (CL08-040) Footwear (Safety,
Athletic & Walking)-Item-Safety from Woodwards Department Store of Cyril, Oklahoma. Exhibits: Department
Recommendation, Price Sheet, Contract Extension Form.
16. Consider extending the contract (CL08-040) Footwear (Safety,
Athletic & Walking)-Item-Athletic from Kessler s Team Sports of Richmond, Indiana. Exhibits:
Department
Recommendation, Price Sheet, Contract Extension Form.
17. Consider approving appointments to boards and commissions. Exhibits: None.
18. Consider approval of payroll for the period of January
11 - 24, 2010.
NEW BUSINESS ITEMS:
Mayor Purcell stated they need to strike item #20.
19. Receive a demonstration from E.I. Technologies on the
City s new GIS web application.
Exhibits: None.
Rick Endicott, Finance Director, stated in the 2005 CIP, voters approved approximately
$3
million for computer hardware upgrades which included geographical information systems. For
years the City of Lawton has been operating in a non-integrated system. Last year in the budget,
the Council approved an actual GIS division. He introduced Mike Jones, Supervisor and Judy
Franco. He introduced Nirav Shaw, President of E.I. Technologies. His company is under
contract to help integrate our GIS function. He stated this will be ready to go out to the public
in
the next sixty days.
Nirav Shaw stated they have worked on this program for the past twenty-four months. He stated
that staff will be using this before it goes out to the public.
Mr. Shaw provided a demonstration of the latest component of the City s Geographic
Information System.
Haywood questioned if this will tell you how many homes are in a neighborhood.
Mr. Shaw stated you can find out how many parcels in a ward or school district.
Endicott stated the big thing will be to keep this program updated and the information
fresh. He
stated the public works staff put in a lot of man hours for this program.
Wells questioned if this would eventually tie in with E-911 phase two.
Mr. Shaw stated system integration will be available to the staff in the next few
months.
Endicott stated one of the bigger challenges is addressing. They have millions
of different hits
on the way people are addressing and they will have to deal with that issue.
20. Consider amending Council Policy 2-3 which provides that
damage claims approved for
payment in an amount less than $400.00 will be paid by the responsible division s budget as
opposed to claims approved for $400.00 or more, which are paid by confession of judgment in
District Court and placed on the tax rolls. Exhibits: Council Policy 2-3.
THIS ITEM WAS STRICKEN FROM THE AGENDA.
21. Consider waiving the impact fees for water and sewer service
for the new Hospice of
Southwest Oklahoma inpatient facility located at 1001 SE 36
th Street. Exhibits: Letter from
Hospice of Southwest Oklahoma.
Richard Rogalski, Planning Director, stated a request has been received from Hospice
of
Southwest Oklahoma to waive the impact fees of $9,000 for water and sewer service for the new
inpatient facility being constructed at 1001 SE 36
th Street. The water meter size is 2 inches
which requires impact fees of $4,000 for water and $4,000 for sewer. Also there is a $1,000
impact fee for a 1-inch water meter for an irrigation system. He stated Section 22-2-2-222C
(water) and Section 22-3-14-391E (sewer) of the Lawton City Code state Any applicant for a
low or moderate income or senior citizen residential housing project may apply to the city
council for a modification or waiver of the fee. The Council shall consider the application on a
case by case basis. He stated this facility will allow patients to continue to receive
hospice care
when their symptoms can no longer be managed in their homes and will serve as the
administrative offices for Hospice. Ten to fifteen percent of their patients are uninsured, non
paying residents and eighty percent of the patients are 65 years old or older. Staff did feel
like
this falls under the intent of the code and they do recommend approval of this waiver.
MOVED by Shanklin, SECOND by Zarle, to waive the impact fees for water and sewer service
for the new Hospice of Southwest Oklahoma inpatient facility located at 1001 SE 36th Street.
AYE: Haywood, Wells, Hanna, Drewry, Burk, Shanklin, Zarle. NAY: None. MOTION
CARRIED.
22. Consider approving a request from the School House Slough
concessionaire, Kent Waller,
to construct two proposed boat docks to be built at School House Slough in accordance with the
lease agreement at School House Slough approved in 1999 between himself and the City of
Lawton. Exhibits: Letter from Kent Waller dated October 29, 2009 and Map with location
identified.
Kim Shahan, Parks and Recreation Director, stated in 1999 a concession lease was
awarded to
Mr. Waller and at that meeting he made a presentation of the improvements that would be done.
Over this time he has been making these improvements. Based on the lease, the requested
improvements will be brought to the City Council for consideration. These improvements are
boat slips within the School House Slough area. (A map was distributed). This is on a peninsula
area of the slough and the request is to build 23 boat slips within that area. He stated this
morning Mr. Waller told him he would modify his request and build only 11 in that area. Staff
is
concerned about the vehicle access on the peninsula. He stated this was submitted in 1999
as a
proposed plan. His recommendation is to deny the request. There
are people who want to
access that area that are not users of boat slips and there is a possibility they would not be able
to
access that area.
Drewry stated that area is very congested and she does not see how they can put anything
else in
there with all of the boats that are going in and out of that slough area.
Burk stated he feels it is a parking issue. Even if you don t park on
the peninsula, where do you
park to get to your boat slip. He stated there are a lot of people who go down there to
fish and
this will take away from their area. He just cannot support this request.
Zarle questioned who would be liable if there was an accident.
Shahan stated if they were on the water, it would be the City of Lawton.
Kent Waller stated his contract was approved in May of 1997, not 1999. He stated
this road on
the peninsula has been there as long as he can remember as cars have gone out, turned around
and come back. He stated it is tight. In 1997 when he submitted his proposal to the City
of
Lawton, he submitted a plan which was approved by the Lawton City Council. Nowhere in the
plan did they say that he needed to come back to the City Council for approval. He has fulfilled
his part of the plan. In the plan he was authorized 55 wet slips. If he is allowed to build
these, it
would be a total of 49 new ones that he has put out there. He is under the number that was
proposed in 1997. He stated they have a waiting list and they want to park in the parking lot,
walk down and get on their boat. He does not see this as a problem. He stated he would
take
two of the older docks that are on the south side and he would move over to where it would just
be 11 docks on that side and then build a new dock on the south peninsula that would hold about
23 or 24 new boats. There is plenty of parking over on the south peninsula. He stated the
roads
and parking lot at the lake are not his responsibility. They were taken out of his lease. He
tries
to take care of the citizens of Lawton. He has the only marina at any of the city lakes that has
gas
and a functioning store.
MOVED by Drewry, SECOND by Burk, to deny the request. AYE: Wells, Hanna, Drewry,
Burk, Shanklin, Haywood. NAY: Zarle. MOTION CARRIED.
23. Consider an ordinance amending
Sections 22-2-2-222 and 22-2-2-225, and Sections 22-3-14-391 and 22-3-14-393, Lawton City Code, 2005,
regarding water and sanitary sewer system
impact fee and lease-purchase agreement requirements and procedures and declaring an
emergency. Exhibits: Ordinance No. 10-___.
Rogalski stated on December 16, 2009, the Impact Fee Oversight Committee met to discuss
certain provisions with within the water and sewer impact fee and lease-purchase
agreement
code sections per the request by City Council. The specific items discussed
were: 1) Section
22-2-2-222 (A) Water system impact fee established of the City Code in that Councilman Wells
would like to address that section of the code which deals with remodeling or additions to
existing structures that may cause an increase in meter size or an increase in the number of
meters serving the structure, 2) Review and discuss Section 22-2-2-222 (B) Water system
impact fee established of the City Code in that Councilman Wells would like to address that
section of the code which exempts the Downtown Area from assessment of the impact fee and
3) Review and discuss Section 22-2-2-225 Lease-purchase agreement procedure of the
City
Code in that Councilman Burk would like to address that section of the code which increases the
time frame when a developer/owner may receive the benefits of the lease purchase agreement,
specifically, when the developer/owner fails to submit the application and receive Council
approval prior to the construction of the improvement. He would like to allow the
developer/owner to be able to apply after construction is complete.
During the course of the discussion, the Impact Fee Oversight Committee determined
that it
would recommend no change to Section 22-2-2-222 (A), but would recommend amending
Section 22-2-2-222 (B) to terminate the exemption of the Downtown Area from the collection
of impact fees on January 1, 2013. With regards to Section 22-2-2-225, the committee felt that
the current requirement that applications for lease-purchase agreements be approved by City
Council prior to beginning construction was too rigid. The recommended change would allow
applications to be submitted after the start of construction, but that the agreement must be
approved by City Council at the time the qualifying improvements are accepted. The
recommendation included making this provision retroactive to July 1, 2009 in order to allow
acceptance of any applications that would have met this requirement but were denied under the
existing code.
The Impact Fee Oversight Committee directed staff to draft the recommendations for
both the
water (Sections 22-2-2-222 and 22-2-2-225) and sanitary sewer (Sections 22-3-14-391 and 22-3-14-393)
system impact fee and lease-purchase agreement requirements and procedures, and
forward them to City Council for consideration.
MOVED by Drewry, SECOND by Burk, to adopt Ordinance 10-02, waive the reading of the
ordinance, read the title only and declaring an emergency.
Wells stated he would like to make a substitute motion that Section 22-2-2-222, the
last line in
paragraph A reads The remodeling of or an addition to an existing structure shall also be exempt
from this fee provided there is no major redevelopment or development of the existing property.
He stated in Section 22-3-14-291, the last line in the paragraph basically says the same thing.
SUBSTITUE MOTION by Wells, SECOND by Hanna, to adopt amended Ordinance 10-02.
Jensen stated he understands the substitute motion, but he does not understand what
Councilmember Wells means by a major development or redevelopment. There is no way
to
determine what we are talking about here. He stated they need some more definition.
Mayor Purcell suggested they pass this ordinance tonight as is, and bring back another
ordinance
with Councilmember Wells recommendation.
Wells stated he wanted everyone to understand that at the committee meeting the item
did not
come up for a vote, but the feeling among the members was that they should not change it. Had
it come up for a vote, the majority would not have voted to do this, but there were some who
would have voted to do this. He thinks this is unfair to charge those, who have been paying a
bill
for years, a fee to go from a 5/8 inch meter to a one inch, or a one inch to a two inch meter. He
would like to have an item come back to the Council to change this wording.
Mayor Purcell stated Councilmember Wells will meet with the City Attorney and come
back
with the words he would like and how they are going to judge that at the next meeting.
Wells agreed to withdraw his substitute motion.
Hanna agreed to withdraw his second.
VOTE ON ORIGINAL MOTION: AYE: Shanklin, Zarle, Haywood, Wells, Hanna, Drewry,
Burk. NAY: None. MOTION CARRIED.
(Title read by City Attorney) Ordinance
10-02
An ordinance pertaining to utilities amending Section 22-2-2-222 and Section 22-2-2-225,
Division 22-2-2, Article 22-2, and Section 22-3-14-391 and Section 22-3-14-393, Division 22-3-14, Article
22-3, of Chapter 22, Lawton City Code, 2005, by limiting the exemption of the
downtown area and modifying the lease-purchase agreement procedure, providing for
severability, and declaring an emergency.
24. Consider approving an ordinance pertaining to Buildings,
Construction, and Housing,
amending Sections 6-1-1-104 and 6-1-1-106, Division 6-1-1, Article 6-1, amending Sections 6-2-1-201
through 6-2-1-203, Division 6-2-1, Article 6-2, and amending Sections 6-4-1-401 through
6-4-1-403 and Sections 6-4-1-406 through 6-4-1-408, Division 6-4-1, Article 6-4, all in Chapter
6, Lawton City Code, 2005, by adopting the international codes that have been previously
adopted by the State of Oklahoma, specifically the 2009 editions of the International Plumbing
Code, International Mechanical Code, International Fuel Gas Code, and Chapters 12-24 and 25-33 of the
2009 edition of the International Residential Code; providing for severability and
declaring an emergency. Exhibits: Ordinance 10-__.
Bryan Long, Assistant City Manager, stated this item will bring us up to date on
our code
references that are adopted by virtue of our ordinance. He stated this is a routine item and the
development community has been made aware of these changes approximately six weeks ago.
Staff has received no comments opposing the changes being adopted.
Burk requested that when they do these code changes they give at least three to six
months lead
time for all of the trades. It is major for them to undertake all of these code changes. He
does
appreciate the letter that went out, but it does take more than six weeks. He stated the effective
date is February 1
st and it does not give them much time.
Long stated they can expect that every three years there will be a major implementation
of a new
code and the State of Oklahoma is almost always going to accept those code changes.
Burk stated we are not always so gung ho on getting them passed. He stated
sometimes we have
been ten to twelve years behind in the code changes. It is good that we are keeping up.
Mayor Purcell stated that instead of declaring an emergency, they can choose to establish
an
effective date. He questioned if this would solve the problem.
Burk stated that would relieve a little bit of concern on the building side. He
stated an extra 90
ninety days would be good.
Jensen questioned if this would cause a problem with the state.
Long stated the only issue is the fact that staff has already sent out a letter informing
a number of
contractors of the change. He stated they could send another letter.
Mayor Purcell stated the City Council can establish an effective date of May 1, 2010.
The
contractors can choose to implement them before that date if they wish.
Burk stated some of them have already implemented the changes. He would appreciate
it if staff
could send out another letter changing the effective date.
MOVED by Burk, SECOND by Hanna, to adopt amended Ordinance 10-03, waive the reading
of the ordinance, read the title only and establishing an effective date of May 1, 2010. AYE:
Haywood, Wells, Hanna, Drewry, Burk, Shanklin, Zarle. NAY: None. MOTION CARRIED.
(Title read by City Attorney) Ordinance
10-03
An ordinance pertaining to buildings, construction and housing, amending Sections
6-1-1-104
and 6-1-1-106, Division 6-1-1, Article 6-1, amending Sections 6-2-1-201 through 6-2-1-203,
Division 6-2-1, Article 6-2, and amending Sections 6-4-1-401 through 6-4-1-403 and Sections 6-4-1-406
through 6-4-1-408, Division 6-4-1, Article 6-4, all in Chapter 6, Lawton City Code,
2005, by adopting the international codes that have been previously adopted by the State of
Oklahoma, specifically the 2009 editions of the International Plumbing Code, International
Mechanical Code, International Fuel Gas Code, and Chapters 12-24 and 25-33 of the 2009
edition of the International Residential Code; providing for severability and establishing an
effective date of May 1, 2010.
25. Consider adopting an ordinance notifying the public of
the publication of Supplement No. 5
to the Lawton City Code, 2005, and declaring an emergency. Exhibits: Ordinance 10-__.
Hushbeck stated this is the annual supplement that incorporates all of the changes
that were made
to the City Code in 2009. This also establishes a fee of $25.00 which will cover the printing
costs.
MOVED by Hanna, SECOND by Drewry, to adopt amended Ordinance 10-04, waive the
reading of the ordinance, read the title only and declaring an emergency. AYE: Wells, Hanna,
Drewry, Burk, Shanklin, Zarle, Haywood. NAY: None. MOTION CARRIED.
(Title read by City Attorney) Ordinance
10-04
An ordinance approving Supplement No. 5 to the Lawton City Code, 2005, directing
filing and
notification of the publication of Supplement No. 5 to the Lawton City Code 2005, and
establishing a fee of $25.00 for the sale of Supplement No. 5, and declaring an emergency.
26. Receive a report on the City s financial condition
for the 2
nd Quarter of Fiscal Year 2009-2010, and provide direction to staff. Exhibits: None.
Endicott stated the finance report was distributed with the Council agenda packets. He stated
sales tax is up 2.64% from last year. He needs to make a correction on page one of the report,
under B, the second bullet, the budgeted sales tax revenue is $22,036,513 and we have collected
$10.5 million or 47.93%. He stated franchise tax is down $137,000 compared to last year. The
reason is they did not receive December 2008 revenue until January 2009, so that is misleading
and we are really okay on franchise tax. Police fines and bonds are up as well as all other
general revenue fund.
Mayor Purcell stated that on page one, under A, it says that we have collected 51.27%
of
budgeted revenue for general and enterprise funds combined, but yet the budgeted sales tax
revenue is down. This is because we are way over on enterprise funds, and overall with the two
we are over.
Endicott stated when you combine the totals you get the 51.27%. Enterprise
revenue is up
considerably from last year. He stated water revenue is up $489,000 or 6.53%. Sewer revenue
is
also up 21% and refuse collection revenue is up 21.39%. Landfill revenue is up almost 75%. He
stated we are doing very well on the expenditure side and we are holding down expenses. We
are 47% of our general fund expenditures and 43% of our enterprise expenditures.
COL Lacey questioned if the sales tax increase was due to growth or just price increases.
Endicott stated it is a mix of all of those things. The population growth is
affecting it and over
the last several years several new businesses have come to town. This has been a steady increase
for the City of Lawton for the last seven or eight years. You do not see that in the surrounding
areas.
Mayor Purcell stated we have been fortunate as compared to the rest of the state. We have had
some good folks who did some good budgeting this year.
Burk questioned if there has been an increase in water meters over the last six months.
Endicott stated he has not seen a tremendous growth in the number of accounts. Typically,
people are just transferring their accounts from one location to another. He does not think we
have seen the numbers that we expected to see of new meters as a result of BRAC. He
stated
they are seeing an increase in multi-unit family complexes. This has a huge impact on our water
revenue.
Shanklin questioned how we were doing with the meter replacement program.
Endicott stated staff is still working on 1,200 meters that they are trying to get
reprogrammed and
programmed correctly. They have about 98% in the ground. There are still several large meters
that are not in because they require a lot of work.
Shanklin questioned if they have reached the revenue expected with these new meters.
Endicott stated he does believe that is part of the reason for the increase in water
sales. The
measurement process begins when we sign off on the project and it is 100% complete.
Mitchell stated that regarding our financial situation, we are very proactive and
we have a very
active capital improvement program and obviously all of those sales tax dollars that we are
collecting in our CIP program, we are turning around and spending in our local community.
There are a lot of cities that don t have these types of programs and that has a negative
affect on
the local economy.
REPORTS: MAYOR/CITY COUNCIL/CITY MANAGER
Jerry Ihler, Public Works Director, stated the City Manager had asked him to give
the City
Council an update on the nine-mile creek sewer line. He provided the Council with a summary
report. The line basically runs from the wastewater treatment plant north and east to the area
of
Fort Sill s boundary. The total area of the three sub areas are about 14,000 acres. Twelve
thousand of those acres are undeveloped pasture land. The estimate of probable construction
cost is $11,833,250. He stated there is about 1,850 of existing residential area that will tie
in and
we will be able to eliminate four lift stations. There is about 12,000 acres for potential future
development for Lawton. He stated once developed, you will be able to double the size of the
community.
Mitchell stated they are talking about approximately 50,000 houses.
Ihler stated the consultant is about 85% complete with the design. The estimate
for right of way
costs is $1.8 to $2 million. There are funds in the 2008 CIP to be able to do the design and
probably acquire the right of way.
Mayor Purcell stated there was a cost estimate done and he remembered it was approximately
$9
million.
Ihler stated three years ago they put together an estimate of approximately $9 million. He stated
the current estimate does not even include right of way cost.
Wells questioned what would need to be done to the water and wastewater treatment
plants.
Ihler stated the existing wastewater treatment plant is rated at 18 million gallons
a day. As this
develops, we will have to expand the wastewater treatment plant.
Drewry stated the women s advisory council for the Boys and Girls Club hosts
a valentine
luncheon for women only at Salas restaurant. She has tickets available.
Mayor Purcell stated at the Martin Luther King celebration on January 15
th, Bill Shoemate was
awarded the Lifetime Achievement Award by Lawton Public Schools. He congratulated
Councilmember Shoemate.
Mitchell reminded everyone of the Chamber luncheon on Thursday.
There being no further business to consider, the meeting adjourned at 7:27 p.m. upon
motion,
second and roll call vote.
____
/s/ John P. Purcell, Jr.______________
JOHN P. PURCELL, JR., MAYOR
ATTEST:
____
/s/ Traci L. Hushbeck_______________
TRACI HUSHBECK, CITY CLERK