Month 2001-5 May
Meeting of 2001-5-14 Special Budget Meeting
MINUTES
SPECIAL CALLED MEETING
LAWTON CITY COUNCIL
MAY 14, 2001 - 6:00 P.M.
WAYNE GILLEY CITY HALL COUNCIL CHAMBER
Mayor Cecil E. Powell, Also
Present:
Presiding Bill
Baker, City Manager
John
Vincent, City Attorney
Brenda
Smith, City Clerk
The meeting was called to order at 6:00 p.m. by Mayor Powell. Notice of meeting and
agenda
were posted on the City Hall notice board as required by law.
ROLL CALL
PRESENT: Randy
Bass, Ward One
James
Hanna, Ward Two
Glenn
Devine, Ward Three
John
Purcell, Ward Four
Robert
Shanklin, Ward Five
Barbara
Moeller, Ward Six
Stanley
Haywood, Ward Seven
Michael
Baxter, Ward Eight
ABSENT: None.
BUSINESS ITEM:
1. Discuss the preliminary City of Lawton budget for fiscal
year 2001-2002 and take
appropriate action. Exhibits: Preliminary Budget was previously distributed.
Baker was recognized to make a presentation. Shanklin asked that points in the newspaper
editorial be addressed. Baker's presentation in Powerpoint is summarized as follows:
Preliminary budget is submitted in accordance with the City Charter and the Oklahoma
Municipal Budget Act. Deadline for approval is June 23, 2001. The final budget must be
submitted to the Comanche County Excise Board and State Auditor and Inspector on or before
July 1, 2001. The proposed budget is balanced without the need for revenue increases.
Comparison of current and proposed budget was given as: 1) Operating Budget for the
current
year is $52,791,597 and proposed is $53,839,020 for an increase of $1,047,423 or 1.98%
minimal increase. 2) Capital Improvements Program for the current year is $21,647,934 and
proposed is $14,759,111. This amount will fluctuate yearly depending on the projects to be
accomplished. The 2000 CIP and some remaining 1995 CIP projects are being aggressively
addressed. 3) Debt Retirement for the current year is $1,870,912 and proposed is $567,073 due to
the pay off of the bonds to the Bank of Oklahoma in July 2000. Total budget for the current year
is $76,310,443 and proposed budget is $69,165,204, for a decrease in the overall budget of
$7,145,239; actual operating budget is up $1 million.
Directors requested $58,695,978 from the operating budget and Baker cut $4,856,958 to
reach
the proposed budget. Directors have a responsibility to ask for what is needed, and the City
Manager is then responsible to balance the budget. Directors are aware of the cuts being
recommended and would like to address Council during budget reviews.
Projected revenues must equal or exceed recommended expenses and allow for a carryover
to
support the following year's budget. The preliminary budget was balanced by projecting
moderate revenue increases for sales tax and utilities, and significantly reducing expenditures.
There is no request to increase the rates for either sales tax or utilities, but only a projection that
the collections from those sources will increase by 2%.
City Council approved items during the year that require funding from the budget, such
as the
three-year contract with the firefighters' bargaining unit, which contains a 4% pay increase. The
two-year contract with the police bargaining unit contains increases ranging from 2.25% for most
officers to 3.5% for those officers in Step H. Implementing a mass transit system was approved
and $200,000 was included, assuming a start-up of the system in Spring 2002; Planning
requested $364,881 as the first year local share anticipating a start-up in October 2001. To
balance the budget, that much could not be included, and due to delivery time of busses, we are
looking at a spring start-up and if Council desires that it be done sooner, funds will need to be
added. Eight employees were added during the year and $306,000 was included in this budget
for those employees.
Other increases were maturation of the pay plan. Merit increases of 2.5% are given periodically
and this will increase costs by $540,000 next year; this is a built-in increase in the pay plan. Fuel
costs have increased significantly this year and continue to escalate; the City will be over budget
for petroleum products by $76,746 and that increase was included in next year's budget. Energy
costs, electricity and natural gas in Account 248, are projected to be over-budget this year by
$287,449 and that same increase had to be budgeted for next year. Chemicals for the water
treatment plant and wastewater treatment plant, we have increased the recommendation by
$162,847; the amount of chemicals is directly related to the amount of water treated and the more
water treated and sold means the more revenue that will be received. The City's payment to
Waurika Master Conservancy had to be increased by $67,000.
Assumptions made in preparing the budget were: The same types and levels of services
would be
provided next year. Also, an assumption was made that Council did not want to raise utility rates,
although that formal direction was never given but it appeared to be a consensus. Another
assumption was there would be a $3.5 million carryover to support next year's budget and that is
an optimistic assumption that Baker was not real comfortable with. Carryover to support the
current year's budget was $4.4 million and it is hoped the $3.5 million will materialize.
Another assumption is sales tax collections will increase 2% over the current year's
collections.
The last three reports have been very encouraging and this should materialize. A 1% increase in
sales tax represents $150,000. There was a 42% increase in sales tax, which is very misleading
but also a Godsend; the State did a one time correction which added two weeks' sales tax to our
revenue, amounting to about $700,000, so prayers were answered in providing additional revenue
to support the carryover and that is good news. Major construction projects starting soon are
Central Junior High and the Veterans Center, and the Commanding General said troop strength
will go up, so the sales tax should increase by 2% next year. Another assumption is utility
collections will go up 2% next year, and this is realistic although it may be optimistic.
Another assumption is petroleum, natural gas and electricity costs will stabilize. If
that does not
happen, there will be a shortage in these accounts next year, and petroleum is a concern.
The biggest assumption includes budgeting a lapse of $750,000 for salaries. The normal
lapse is
around $500,000. The budget is developed assuming every position in the City service will be
full for the entire year, and that never happens and there are cost savings in salaries when there
are vacancies, and this is what is referred to as the "lapse". In order to realize the $750,000
lapse,
the modified hiring freeze will have to continue and this will have to be watched carefully.
Actions taken to reduce expenditures were: Almost $1 million reduction for capital outlay
items.
This year there is $3 million budgeted for capital outlay and next year's recommendation is $2.1
million. The fleet is in the best condition it has been in for the last 27 years, and this can be done
for one year. Departments requested $5.4 million in capital outlay and Baker cut that by $3
million. In 1996 the City Council initiated a $3 per month surcharge to be used exclusively for
purchase of capital outlay. The $3 generates approximately $1.2 million per year, and as a result
of this commitment, the City fleet is in excellent condition. Deferring replacement of capital
outlay to assist in balancing the budget can be done this year, but must not be considered for
successive years; if this is done for more than one year in a row, condition of the fleet will
deteriorate, maintenance costs will increase, quality of service and responsiveness to citizens will
be adversely affected. In addition, the impact on future budgets will be significant as there would
be a need to catch up.
Recommendation is to reduce staff by ten positions; first year savings will be $397,383.
The
positions recommended for deletion are: Senior Library Associate - Library; Plumbing Inspector
- Building Development; Traffic Engineer - Engineering; Sanitation Worker - Solid Waste
Collection; Parts Courier - Equipment Maintenance; Plant Mechanic - Wastewater Treatment
Plant; Park Specialist - Park Maintenance; Senior Clerical Assistant - Park Maintenance; Clerical
Assistant - Information Services; Senior Secretary - Police; Jailer - Police. Recommendation was
to add a police clerk in lieu of the senior secretary position, for a net reduction of ten in staff.
As
of tonight, six of these ten positions are vacant and another vacancy is anticipated by July 1
through retirement. The goal is to insure that no employee is laid off. Baker asked for the
flexibility between now and the time the budget is approved to look at vacancies and substitute
other positions for these, subject to Council approval, but we do not want to lay anyone off
unless we absolutely have to.
Account 204 (Petroleum Products) was reduced by $324,000 and the recommendation is to
include in next year's budget the same amount that will be spent this year, not the same as the
appropriation because that obviously would not be enough money.
Account 201 (Miscellaneous Supplies, Tools & Equipment) was reduced in all activities
by 25%.
In Account 264 (Schools, Training & Travel), the departments requested $390,000
and Baker
reduced it to $266,000, which is $44,000 less than budgeted this year. Baker said the emphasis
next year will be on schools and training, as opposed to travel, and he was planning to send a
directive to the departments stating that on national conferences and seminars, only one person
from the department may attend if it is approved in the budget. During tight budgets, we cannot
afford to send two, three, four people to a national conference; the one person who attends can
bring back the literature and information and brief the other members of the department.
Baker said there had been complaints that general employees were receiving too much
in
clothing and he agreed that since its inception, that program has gotten a little out of hand, so
25% was cut from each activity for general employees but not police and fire because their work
clothing is covered by the employment agreements. Department requests were reduced by
$38,000 for work clothing.
Appropriations for the Museum for the current year were $515,000, and Council approved
an
additional $20,000 recently to help with paying utility bills. The Museum requested $530,000
this year and Baker recommended $475,000. He said he could not cut every one of the operating
departments and leave funding for the Museum intact without touching it.
The City also supports the Community Intervention Center, which is part of the Marie
Detty
operation, and the current contract is $95,000; recommendation for next year is $75,000. For
both the CIC and Museum, Baker had written appropriate letters advising them of his
recommendation and fully expected Council may be asked to restore the funding.
Council Contingency was reduced from $200,000 to $100,000.
A 3% cost of living adjustment for general employees is recommended at mid-year, provided
however that funds are available at that time. If the revenues are good and expenditures are lower
than expected and funds are available at mid-year, the Council should give this cost of living
increase. By deferring it for six months, we are saving $307,000. Baker said he was unable to
find a way to include the increase for the entire year but would have liked to do so. The
Employee Advisory Committee officially requested a 6% cost of living increase, and an
additional hard holiday, Veterans' Day. Baker said he was not supporting either of those
recommendations as the City cannot afford a 6% increase and 6% would not be appropriate, and
there are plenty of hard holidays and flexible holidays at the current time. Some divisions have
difficulty getting their mission accomplished because the City is very generous in its leave
policy. The Chairman of the EAC might want to address Council during budget reviews.
Funds are included for the second year of the 2000 Capital Improvements Program. The
proposed budget provided $2,661,200 for the fourth year of the sewer rehab program, which is an
EPA and DEQ mandated program consisting of three, seven-year phases, and we are going into
the fourth year of the first phase. This work is being done in-house and citizens were told this
would save $2 million per phase, or a total of $6 million, and from quarterly reports, that is being
done.
There were severe ice storms last winter and Lawton will receive $829,046 from FEMA
and the
State Office of Civil Emergency Management to repair and replace damaged streets and alleys.
These funds have been placed in Fund 35, which is part of the capital improvement budget, and
they are designated strictly for street and alley repair and will be used for nothing else. Funds
must be spent within 18 months and will not lapse at the end of the fiscal year.
A pumping surcharge of $198,000 is included to pay for transfer of water from Lake Ellsworth
to
Lake Lawtonka. This is a revenue-neutral item because the charge is passed on to the customers.
$32,500 was included in the City Manager's budget for a Youth Services Coordinator,
which
Council approved March 27, 2001. The job description is being finalized and recruiting will
begin soon. It is hoped that someone will be on board at the end of the year or shortly thereafter.
Health costs continue to increase; the City is self-funded for health insurance and
there are
problems with prescription drug costs. Recommendation is for a 3% increase in the City's
contribution, which amounts to $80,000; employees with dependent coverage would also
experience a 3% increase, which is about $3 per pay period for those employees. The City pays
the entire cost of the premium for the employee and 50% of the premium for dependent
coverage. The City has an excellent health plan and the premiums are still very reasonable.
A total of $150,000 is included in the Mayor and Council budget to fund economic development
initiatives which may be approved by the Council. Also in the City At Large budget in the
Finance Department is $380,000 for hotel/motel expenditures and it is a break even type of
thing.
The balanced budget includes a reserve of $556,195, which represents 1.6% of the operating
portion of the general fund. Many government finance officers advocate a reserve in the range of
8-10% so Lawton's reserve is very small. In future years, Council should consider increasing that
reserve, which would include carryover, lapse at the end of the year, but this is a fund that can be
used to address unforeseen emergencies and help support the next year's budget. As Council
reviews the budget, Baker strongly encouraged that the reserve not be reduced.
Baker said he had done everything possible to present a preliminary budget which requires
no
rate increases and this will not be possible next year unless revenue increases significantly,
expenses decrease significantly, or a combination of both. It appears a certainty that Council will
have to seriously consider raising utility rates to fund the 2002-2003 budget. Service levels,
programs and projects will be seriously affected if additional employees are cut, if replacement
of capital outlay is again deferred, and if appropriations in maintenance and operating accounts
are further reduced. (end of presentation)
Devine asked if the City could benefit from a program to allow employees with 25 years
of
service or more to retire without penalty. Baker said as far as budgeting he did not think it would
be a significant savings; it might provide incentive to long-term employees at the top of the plan
receiving top benefits for longevity and sick leave pay if they want to retire. Baker said he looked
at that a couple of years ago and the actuary said it could be done but it would cost the retirement
plan; there would not be a tremendous amount of savings for the budget other than hiring
replacements at the lower salary rate without having those benefits at the maximum amount.
Devine said it would seem that some savings could be realized. Baker said he could look at it,
and the retirement plan provides for a 5% penalty for every year an employee retires early and
most people cannot afford the penalty. Mayor Powell said you are trading dollars and experience
for less dollars and less experience, and he had seen the Lawton Public Schools do that many
times.
Gary Jackson, Assistant City Manager, presented a spread sheet showing the bottom line
of
expenses and revenues in the general fund, as well as the carryover and total projected resources
less expenses and transfers, giving a final year-end balance of $556,000. As Council goes
through adding or subtracting from the budget, a running tally will be kept to be able to see the
effect on the bottom line.
Shanklin asked if there would be any pay raises greater than a step a person would qualify
for to
any employee. Baker said no, for those employees who are eligible for a step increase, they
would get those; for general employees the steps are 2.5%, and police and fire are 5%, and
whatever else Council might approve would be the only things they would get.
Shanklin said on September 1 the lake levels have to be what the Water Resources Board
say
they have to be and it would be three feet at Lake Lawtonka and five feet at Lake Ellsworth.
Baker said it is 2.7 feet at Lawtonka and 2.5 feet at Ellsworth. Shanklin asked if the three and
five feet he and Ihler discussed was out the window, and Ihler said Baker's numbers were correct.
Shanklin said he thought there would be more pumping costs than we had anticipated.
Shanklin said Baker had been forewarned about one of his questions; a considerable amount
of
money was spent on travel this last year and asked how many times four people went the same
place at the same time. Baker said he would have to check; he knew that throughout the year we
have had more than one person go on these national conferences and seminars and his directive
will prohibit that.
Shanklin asked Baker to explain the 27% pay raise that the newspaper refers to; how
did the
newspaper get there with 27% and what is it really. Baker said he believed the newspaper was
referring to 27% which consists of 4% per year by contract, that would be 12% for three years,
and then the step increases for firefighters are 5% so if you had a firefighter that was eligible for
three years for a step increase, he would get 15% as part of the pay plan. Baker said that 15% has
always been there and is not a new cost; if you add the 15% and the 12%, you get 27%. Shanklin
said the 15% has been there, plus the fact that they are not all qualified, very few of them will get
or probably none of them will get the 15% in three years. Baker said he did not know. Shanklin
asked how long they have to stay in the grade and thought 85 or 90 of them were all in one slot.
Baker said he could not recall what slots they were in but it takes a year to go from one step to
the next. Shanklin said the firemen do not have steps and Baker said yes, they have steps; they
have different steps from general and police, but they have steps.
Shanklin said he may have been wrong and thought we had firemen that had been in a certain
position for x number of years and were not going to get another dime until they retired and that
was the reason we gave them that extra step, and asked if he was wrong. Devine asked if he
meant general employees and Shanklin said he was talking about contract people and that we had
70 or 80 firemen that were in one category and the only raise they would have got was the raise
Council gave them on a yearly percentage. Purcell said those at the top step would not get any
more step increases. Baker said there were a lot of police officers at the top step and as part of
their contract, Council added a Step H to provide them an opportunity. Jackson said in the police
contract, there was already a Step H that was added, however, that one step was at 2.5% instead
of 5%, and that was increased over a two-year period of 1.25% per year for a total of 2.5%,
making a total of 5%. Shanklin said it is not 15% over three years, and if Council approved 5%
per year and 4% per year, shame on us. Shanklin said he was talking about firefighters. Jackson
said the pay plan for firefighters has been 5% steps for many years, and if you are not topped out,
you would get that merit increase, and the Fire Chief indicated he did not know how many were
topped out.
Shanklin asked if he was being told that every firefighter would be getting a 27% pay
increase
over three years. Purcell said some were max'd out and would not get that, but on the ones that
were not, that is correct. Shanklin said there were very few.
Purcell said he thought Baker did an outstanding job of bringing a balanced budget with
the
guidance given. He said only he and Shanklin were on the Council in 1996 when the fleet was in
very poor shape, and they had to depend on CIP funds to replace equipment. At that time,
Council agreed to place $3 on the utility bill to be used for rolling stock. The first things to go
in
a tight budget are maintenance and/or capital improvement, and Council did not want
replacement of rolling stock to be deferred so Council limited what the $3 could be spent on to
rolling stock. Purcell said the resolution used the words "capital outlay" but the discussion
in the
minutes was "rolling stock" only and they specifically in discussion said not computers, desks,
chairs, etc., but only rolling stock. He said the citizens were told that, the $3 was put on the
utility bill, and those on Council got beat up good for doing that but they had to do it. Purcell
said the fleet is now in good shape and maybe the full $3 is not needed every year to keep it up,
although the $5.4 million requested by the departments may have been much more rolling stock.
Purcell read the motion that was made when the $3 was originally adopted so there would
be no
question. He said it came up before when Richard Williams wanted to use the money for
something else and saw that the resolution said capital outlay, which is absolutely correct, but
Council was told it had to read that way because there was no such legal term as rolling stock.
Purcell said the motion was made by Charlie Beller and seconded by Cookie Green to do a 7%
increase in utility rates and $3 surcharge for rolling stock and adopt the resolution, and that
motion passed five to two at the time. He said he would not go back and tell people we changed
our minds five years later and want to use the money for rolling stock for some other purpose,
and that gets Council in trouble with the citizens when they tell them one thing and go back later
on when something else comes up and use the money somewhere else. Purcell said he would not
support reducing the money for rolling stock down to this number.
Purcell distributed an analysis showing the departments and account numbers with the
proposed
budget of $1,228,363 and went item by item to see how much of that was for rolling stock by
department. Of the total we should be using for rolling stock, we are only going to use $902,000
for rolling stock, $59,000 for computers and $267,000 for others; that is not what we said the $3
was for, we said it was all for rolling stock. He said at the bottom of the page he had listed other
capital outlay, and we are down to about $1 million and of that, $683,000 comes from specific
funds that can be used for no other purpose, such as grants, 911, CDBG, Enterprise, Sewer
Rehab, Drainage, etc. In the normal budget, we are only putting $317,000 in capital outlay over
and above the $3 surcharge.
Purcell said the $3 per month generates $1.2 million but we are only using $2.20 this
year on
rolling stock, yet that is all to be used for rolling stock. He suggested reducing the utility bill
by
seventy-five cents for rolling stock and collect $2.25 for rolling stock per month and seventy-five
cents for other capital outlay, with the utility bill to remain the same. Purcell said he understood
this would be a burden to do administratively but he would not go against what the citizens were
told in 1996. He said it may be possible to do this for one year, but as soon as that is started it
could become a pattern and the City could end up in the bad shape it was in before as far as the
vehicles are concerned.
Devine asked how much that would affect the budget. Baker said if Purcell's suggestion
were
approved it would not change the budget and it would just identify the revenue sources
differently. Baker said as long as you are funding $3 million plus, there is no problem identifying
$1.2 million of that as rolling stock, but when you cut it down to $2 million and try to buy any
other capital outlay, you cannot spend $1.2 million on rolling stock. Baker said he realized this
during budget preparation and looked at the resolution that Purcell referred to, and the resolution
says capital outlay, as does the schedule of fees and charges, but he remembered the discussion
in 1996 and agreed with Purcell that the intent was to buy things with wheels on them, but there
would not be enough left to buy the other capital outlay so he made the conscious decision to
prepare the budget in this manner. He said Purcell's suggestion sounded like a very feasible
solution, it would not cost the citizens any more money but it straightens out that dilemma.
Baxter said he was not here in 1996 and heard the term rolling stock being used. He
said he saw
no sense in changing everything if the resolution already says capital outlay and agreed with the
method the City Manager used in addressing that in the budget.
Shanklin said we all have the sheet showing where we have grown 100 employees in ten
years,
and he had a budget that was ten years old, and for the record, the budget has grown in
expenditures for the firemen $1.9 million in ten years in the 100 accounts so he did not know
about the 5% and if you compound that for ten years, that is a lot of money. He said he was
looking at 1989-90 and wanted to compare it to this budget as they went along and the
information from Human Resources shows a growth of 96 positions net; 25 of those were in
sewer rehab and 19 of those 25 is all we have ever hired because we could not get a full
complement of people. Shanklin said in the Street Division in 1991-92 there were 44 people and
now they have 43, and it seemed we had really grown a tremendous number in Code
Administration, and Police and Fire employee levels have remained the same. He said we need to
find out where these people actually went and why we need them if we did not need then 11
years ago. Shanklin said
he wanted them isolated out as to what departments have been expanded and enhanced in
numbers of people when he knew we had not grown any, and he would not argue that services
were improved but he could not measure that. He said we are spending $100,000 in chemicals
when none was spent 11 years ago that he could find in the budget book, and that shows how far
EPA and different mandates have gone during that time to cause an upgrade of the water.
MAYOR AND COUNCIL: Note was made of Account 279, Other Expenses, containing funding
for the Centennial. Funding had been carried over from previous years to support this effort and
$25,000 will be needed from next year's budget for this purpose. This account also supports the
Environmental Committee and Mayor's Commission on the Status of Women. The Mayor and
Council budget ten years ago was $127,000 and now it is $291,000. Reason for the difference
was the addition of $150,000 for economic development.
CITY CLERK : Shanklin said it is $135,000 this year and
eleven years ago it was $85,000 for
the 100 accounts. He said he could show divisions where the same number of people have
doubled in personal services, although this one did not. Purcell said all of them would be more.
CITY MANAGER: Shanklin said there were three people, now there are four, and it
went from
$131,000 to $285,000 so that more than doubled. Purcell said two positions were added.
Shanklin said there was not an Assistant City Manager ten years ago per se.
NEIGHBORHOOD SERVICES: Purcell noted a typographical error with regard to the
capital
outlay and rolling stock. This will be corrected, and Page 6 was correct.
Shanklin asked if a list of vehicles that had been purchased was prepared and Baker
said yes. The
list was distributed. Shanklin said he asked that everything purchased from the $3 rolling stock
be presented from its inception and it allowed for much equipment that would never have been
bought. He said he did not want to be trading off five year old vehicles to get new ones.
Purcell said he would not repeat this every time but he did not agree that $1,637 should
be taken
from rolling stock when it is not for that purpose. He said he objected to all such entries
throughout and a way should be found to address that.
Shanklin asked if the seven employees are all new or if they were in Bridwell's report;
were they
from some other area. Jackson said it may have been shown under Code Administration
previously. Mayor Powell asked if the only new employee would have been the supervisor.
Jackson said there was a zoning administrator in earlier years and it was eliminated in favor of
this position. Shanklin asked if ten years ago, everything under Tucker's purview, his license
people and Neighborhood Services, was all in one deal. Baker said in 1991 those people would
either have been assigned to Code Administration or there was a division called Field Services
that actually mowed and abated nuisances so it would have been spread between the two. Baker
said the Health Department previously did enforcement for high weeds and grass and when we
eliminated that service by the Health Department, we added staff to the City to do that code
enforcement and that should be considered when comparing staff numbers.
Shanklin said he would not be able to pick up that information going through the budget
like this.
Baker said it is difficult to do that for ten years due to reorganizations, title changes, divisions
that are renamed, and it is real hard to compare ten years ago to current. Shanklin said he would
like to see a comparison to see if we are doing the same thing now with 25 people that was
previously done with ten people, and he was not saying to cut the 25 back to ten. He said we have
grown 75 people other than the sewer rehab. Mayor Powell said between now and the next
workshop, staff could see where these people came from and provide the information so that will
cover this in its entirety.
Baxter said Account 231 went from $27,000 to $70,000 for Professional and Technical
Services.
Jackson said that includes the weed abatement contractor, as well as demolition costs which were
previously handled under CDBG, but all demolition is included in this account now. Baker said
the abatement effort was also expanded to include junk and debris. $28,000 was for demolition
and $42,000 was for high weed and grass abatement.
Shanklin asked if the City is reimbursed when we mow someone's yard. Baker said rarely
and we
are working with the City Attorney to see if it is possible to do that differently where we would
have a better chance of getting our money back. Vincent said it is placed on ad valorem like a tax
but it is not collected as a tax; if they go to Sheriff's Sale or the County gets it for delinquent
taxes, it is eliminated. Shanklin asked if we do get some money back and the Clerk said yes.
HEALTH: Baker said this is the contract between the City and the City-County Health
Department for their services.
Baxter said this is a lot of money for health inspections that they are supposed to
do four times a
year, and some restaurant owners are lucky to get inspected once a year. He said it might be
possible to do this by staff and save money. Mayor Powell asked if laws prohibit that. Baker said
it can be done; the Health Department is required by State law to do certain work in a
community, and we are paying for the additional work they do here. Baker said Alltizer and
Jackson were asked to meet with the Health Department to see if the City may want to do some
of these activities and either reduce the contract or possibly eliminate it. Mayor Powell asked if
the law says the Health Department has to do this. Baker said that was his understanding, and the
food establishments must be inspected once a year to comply with State law, and Lawton's
standard is four times a year so we are paying the Health Department for those three extra
inspections and citizens benefit from that. Mayor Powell said that did not need to be eliminated.
Baxter said his point was he did not think they were doing it four times a year. Angie Alltizer,
Neighborhood Services Director, said City staff seems to be doing some of the work listed in the
contract already, and some work must be done by a licensed sanitarian and no City staff have
received that classification. Purcell said the contract can be examined with regard to duplication
but they should be careful because the City got in a bind on the high weeds and grass; we saved
money the first year or two but later on it cost much more. Baker said part of the contract is for
spraying of mosquitoes, and the City could contract that out but it may cost much more.
PUBLIC WORKS DEPARTMENT: Baker said he asked directors not to contact Council
members during preparation of the preliminary budget and told them if they had concerns that
they should present them at the meeting.
Ihler and Shaw distributed separate information on the Public Works budget and Ihler
reviewed
the budget as follows: An organizational chart showed 15 divisions; Lakes Division was
transferred to Parks & Recreation. Personnel authorization changes were: Engineering went from
12 to 14 people and one engineer and one construction inspector are funded from the 2000 CIP;
four concrete repair employees were transferred from Water Distribution to Streets in hopes of
better production; Wastewater Treatment Plant shows elimination of one plant mechanic;
Equipment Maintenance shows elimination of the auto parts courier; Solid Waste Collection
shows elimination of one sanitation worker. Auto parts will be delivered by the supplier or
picked up by the mechanic when required but all attempts will be made to receive delivery. Total
employees went from 295 to 289. Over the last ten years, 11 persons were added to Wastewater
Maintenance due to an EPA mandate requiring the sewer system be cleaned over a five-year
period and that is on-going. Five employees are in the Sewer System Technical Division for the
design of sewer rehab. Twenty-five employees are in the Sewer Rehab Construction group and
they carry out the rehab program; difficulty in obtaining persons to fill all of these positions was
noted. A $240,000 savings should be realized in the sewer design group over the original
projection; the construction group should see a $1.15 million savings above the original $2.6
million that was projected for the seven-year program. Employees and the Mayor were
commended.
A comparison of last year's budget to the proposed budget was presented showing explanation
of
changes. Eleven divisions fall under general or enterprise funds as far as the revenues; four
divisions have funding from special sources, such as the two sewer rehab design and construction
rehab divisions from the 1995 CIP and a loan from OWRB to be paid by a $2.35 sewer surcharge
to be paid back over 20 years for phase one which is a seven-year program, and the drainage
maintenance funded by $1 per month utility bill assessment collecting $468,000 per year to pay
for seven employees and nine seasonal. If a large equipment item is needed, funds are collected
over a few years to purchase it from that fee for that work. Employees and equipment in drainage
maintenance are dedicated solely to that task unless an emergency situation comes up.
Wastewater maintenance is funded by a charge on the utility bill based on water consumption in
excess of 8,000 gallons and less than 12,000 gallons; a little greater than $500,000 per year is
collected through that process.
Further explanation of changes was: Engineering had some costs paid through the 2000
CIP;
Wastewater Collection has a decrease in capital outlay; Solid Waste Disposal has an increase of
$92,000 in capital outlay and $80,000 of that deals with the wood chipper; Sewer Construction
has an increase of $243,000 in capital outlay for various equipment being purchased through the
$2.35 surcharge and $5.2 million from the 1995 CIP for start-up.
Devine asked the cost to refurbish the trackhoe that got buried at Fort Sill. Ihler
will provide
information and said it was a small amount.
Public Works 200 accounts in administration shows an increased utility cost and janitorial
services for the new building. There have been large increases for utility and petroleum costs for
each division. Street Division costs increased due to transfer of employees from Water
Distribution, as well as the costs for obtaining rock and concrete for those employees to work
with. The cost of chlorine at the Water Treatment Plant has gone from $329 per ton last year to
$379 per ton this year and 380 tons were used at the Water Treatment Plant, for an increase in
$19,000 for the product itself. Equipment Maintenance utility costs increased $13,000, they
moved into the new building, as compared to the old building last year which is now occupied by
Wastewater Maintenance and Wastewater Collection. Mayor Powell asked if that was due to the
size of the building. Ihler said partly, but also due to the overall increase in gas and electricity
costs. Shanklin said eleven years ago the chemicals were $70,000 and are now $200,000 at the
Wastewater Treatment Plant. Animal Welfare had an increase in utility costs. Baker said when
we go over budget $400,000 this year, then we have to budget that $400,000 next year so that is
an $800,000 impact, and that is why the utilities have really hurt us. Wastewater Maintenance
shows a cost decrease because very expensive repairs were needed last year to equipment,
although the vendor and manufacturer ended up taking care of that under the warranty.
Public Works prioritizes capital outlay purchases for the department as a whole, which
results in
great variances in divisions from year to year. There is a $556,000 decrease which is almost a
50% cut in comparison to last year's capital outlay and they will make it work.
Mayor Powell said many of their units look very good, and others do not look like they
will pass
inspection. Ihler said most of their rolling stock is in pretty good shape and he would not like to
see that large of a cut every year in rolling stock but could get by this year. Ihler reviewed
replacement of trash trucks in the past few years and said cuts were not made for those divisions
that are self-funded.
Purcell asked that Council receive a copy of the requests by the departments for capital
outlay,
with a check mark showing which are included for funding.
Moeller asked the condition of the street sweepers. Ihler said they did not request
one this year
but would request another one in the next year or so; a new one was recently received. There are
two in working condition, and we own three. Equipment was heavily used due to sand removal
after the ice storms. Purcell said that is an example of getting behind when you do not replace
rolling stock.
Trash truck replacement was further discussed, as well as the seven-year replacement
schedule
for the 24 packer trucks. 13 packer trucks have been purchased since 1996. Purcell said 15
should have been purchased during that time. Shanklin said it may not always be absolutely
required.
HUMAN RESOURCES: Chuck Bridwell said in Account 201, Supplies, $14,000 of that
$17,525 is for safety and safe driver awards and that is money well-spent in attempting to prevent
accidents. Account 231, Professional Services, pays for physical exams and drug screens for
persons coming to work for the City, as well as inoculating employees, voluntarily, against
Hepatitis. Mayor Powell asked if the Sanitation workers are offered free Tetanus shots and
Bridwell said yes and they will be added to the Hepatitis series.
Account 265 provides for City-wide training and there is no money for his staff in it;
included in
that $30,000 is money for the educational reimbursement program which Police and general
employees participate in, as well as computer and supervisory training. There are five full-time
employees, one more than in 1991, and that is the transfer of the Safety Officer from the City
Attorney's Office. The $2,100 in capital outlay is for a computer and it shows rolling stock.
Shanklin compared this division's budget to 1991, noting an obvious error in 1991 and
staff will
check.
Future budget meetings were tentatively set as: Thursday, May 31; Monday, June 4; and
Thursday, June 7, all at 6 p.m. Vincent will be gone May 31 and his budget will be held until
June 4.
REPORTS: MAYOR/CITY COUNCIL/CITY MANAGER.
Shanklin asked if the firemen get 5% per year, plus the 4% cost of living, for a 9%
increase per
year, and asked if that should show a total increase of about $630,000 per year since their budget
last year was $6.3 million and this year is $6,487,000. He said that is not 9% per year. Vincent
said a majority of the firefighters are capped out at their top step but he could not give a number.
Shanklin said they are not getting 27% over the next three years, and no one wanted to agree with
that.
Mayor Powell said there had been complaints about noise and a letter had been received
from
Republic to correct that.
There being no further business, the meeting adjourned at 8:20 p.m. upon motion, second
and
roll call vote.