Month 1999-7 July
Meeting of 1999-7-15 Special Meeting
MINUTES
SPECIAL CALLED MEETING
LAWTON CITY COUNCIL
JULY 15, 1999 - 5:00 P.M.
WAYNE GILLEY CITY HALL COUNCIL CHAMBER
Mayor Cecil E. Powell, Also Present:
Presiding Bill Baker, City Manager
John Vincent,
City Attorney
Brenda Smith,
City Clerk
The meeting was called to order at 5:00 p.m. by Mayor Powell. Notice of meeting and
agenda
were posted on the City Hall notice board as required by State Law.
ROLL CALL
PRESENT: Richard Williams, Ward Two
Glenn Devine, Ward Three
John Purcell, Ward Four
Robert Shanklin, Ward Five
Charles Beller, Ward Six
*Stanley Haywood, Ward Seven
Randy Warren, Ward Eight
ABSENT: G. Wayne Smith, Ward One
*Haywood entered the meeting at approximately 5:05 p.m.
BUSINESS ITEM:
1. Receive a briefing from CH2M Hill, Consulting Engineer for
the Water Treatment Plant
Project, and discuss possible projects for a Capital Improvements Program (CIP). Exhibits: None.
Baker said last September Council held a series of meetings to discuss the capital improvements
program, and at that time there was a sense of urgency due to the sewer rehab program. He said
they tried to rush Council to formulate a program to take to the voters last November; but it
became apparent that it could not be done and it is too important of a task to get done that
quickly. Baker said Council made a wise decision to separate the sewer rehab program from the
rest of the CIP, and as a result, a small utility increase of $2.35 was approved and implemented
January 1, 1999. The CIP question was deferred for future consideration. He said the time is now
for Council to consider and put together a new CIP to replace the 1995 Program, which ends
December 31, 1999.
Baker said the challenge is to identify the most pressing capital improvement needs
of the
community, prioritize those needs, identify funding and get the support and approval of the
citizens. He said that he and staff had an obligation to identify the needs and funding options for
Council consideration, and that this process would begin tonight. Baker said the information
provided is simply staff's recommendation and should serve merely as a starting point for this
process. He said whatever program is put together will be Council's program and not his or staff's
program, but Council's program.
Baker suggested the following format for this meeting: a briefing by CH2M Hill on the
water
needs; the Finance Director discussing funding alternatives; the Assistant City Manager briefing
the proposed program; the City Attorney providing information on statutory deadlines, summary
remarks by Baker, followed by Council discussion.
Jerry Ihler, Public Works/Engineering Director, said in March 1999 the City entered
into a
contract with CH2M Hill for the purpose of analyzing the water system, to include the
distribution system, with regard to providing a model, as well as the main question of what can
be done at Medicine Park to maximize the efficiency of the existing plant and examine its
condition. The direction given to the consultant with regard to desired size and capacity was 45
mgd. The consultant was asked to look at several alternatives which would provide the citizens
of Lawton the most cost effective measures to provide 45 million gallons of treated water. He
said the City is due to have the report by the end of the month, so it is a little bit ahead of
schedule with regard to numbers, but there is no reason for a significant change in the numbers
and it should not be enough to make any kind of a change in the recommendation. He introduced
Murray Fleming from CH2M Hill who is the project manager for this project.
Fleming gave a slide presentation, and copies of the slides are available in the City
Clerk's
Office. Fleming's briefing is summarized as follows: The three water sources are Waurika,
Lawtonka and Ellsworth; the City has not used any of its water rights at Waurika and there is not
a need to do so even in supplying 45 mgd capacity as it can be provided by Ellsworth and
Lawtonka.
The Medicine Park plant is referred to in terms of the north plant and the south plant
and they are
at the same location and are contiguous with common walls but the south plant was built in 1932
with a 10 mgd capacity and the north plant was built in 1967 with a 25 mgd capacity. These are
maximum day capacities and not average and it can go to 50 if 35 is supposed to be the capacity
of the plant. In 1998, the plant produced 36.7 mgd on the peak day, so there is not a magic
number that the plant cannot produce over, and it can do so for one day or a few hours but it was
a signal that the maximum day capacity was being approached and there was a need to look for
what to do next which leads to changing from 35 mgd to 45 mgd capacity. First they focused on
Medicine Park to be sure all the facilities were being used before looking at another plant.
In addition to capacity, the City will fall short of meeting EPA treatment standards
that are
expected to be put into effect in two years; most relate to trihalomethanes (THM) and turbidity.
They looked at raw water sources, conveyance of raw water, water treatment and getting it to the
customers, distributing it and storing it. Each facility, whether it is the lake, the conveyance line,
the plant, pipeline and pump stations or storage tanks, they are all sized differently, and they are
not all sized for 35 mgd or 45 mgd; they are sized to do the job they need to do. The raw water
source is sized just on average and you do not want to run out during a year's period during a
drought. The conveyance must be able to get the water to the plant on a maximum day; then you
must convey the water to customers, but in town there will be even higher demands than the
maximum day, there will be a peak hour during that day, such as 7 or 8 p.m. when everyone is
watering, if the peak during the August day when it was 36.8 mgd for the day, it was probably 40
during the
maximum hour when everyone was watering and using water, and it is meant for the storage and
tanks to supply that water.
The purpose of the study was to identify the improvements that are needed to meet both
the
quantity and the quality goals; increase the capacity to 45 maximum day and it equates to 23 on
an average day. This means that you add up all of the water treated in a year, divide it by 365, in
the year that it equals 23, by past history, you will have a maximum day during that year of 45, or
there is a relationship between average day and maximum day according to historical records
which show it is 1.9 times. If you multiply 23 times 1.9, that gives the maximum day and that is
how they back into those numbers. The 2020 Land Use Plan and Fresh Water Plan both have
those numbers corresponding to about 2015; if you grow faster, it will last a shorter time and if
you grow slower, it will be longer. Certain industrial demand has a tremendous impact and if an
industry comes in that requires a lot of water, that number might become 2010. 3-1/2 to 4 mgd of
the increase is planned for industrial growth, and it could be more or less depending on the
industry that locates here.
Beller asked if there was a rule of thumb as to what usage should be for industrial
purposes
versus the daily maximum; is there a time when you should look at commercial and industrial use
and see if it is going too fast. Fleming said some have huge ratios because of the kinds of
industry they have; some industries require large amounts of water and some require very little,
and there is no general rule of thumb.
Shanklin asked if the 1997 figures were compared to the 1998 figures and if a large
portion could
be attributed to the number of water breaks that took place. Ronnie Graves, Assistant Director of
Water/Wastewater, said some of the difference in numbers could be attributed to breaks.
Shanklin asked if a large gain in utilities was shown and Graves said that would be known at the
end of this year and they usually can account for 80-85% of the water; 1998 showed
accountability for 79%, which is a little less and it may not all be due to breaks. Graves said the
City itself uses a lot of water for irrigation and general purposes. Graves said in June 1999, the
average day usage was 6 mgd less than in June 1998. Shanklin said we cannot say we increased
16 mgd in two years. Graves said water sales outside the City limits had increased and that last
year was very dry and hot, causing water usage to be very high. Williams asked if there were
very many instances where water was being used but not metered. Ihler said he thought it would
be a small percentage of the total; all of the City facilities are not metered.
Fleming continued his presentation: In addition to the flow or quantity, they must deal
with the
health and regulatory issues and quality of the water. Health issues have come up in different
communities over the last few years, so EPA has promulgated some new regulations and stepped
up the disinfection requirements, or the killing of any bacteria in the raw water so it is safe to
drink. If you use chlorine for the disinfection process, it tends to form the THM compounds and
studies have shown that we do not want very many of those, so on one hand EPA is saying to be
really aggressive in making the water safe by using chlorine or some other oxidant, and chlorine
has been the standard in the trade for many years, and at the same time, they are saying to
minimize the other, so these two are in conflict and it has caused a lot of development in the
industry as to how to deal with it. In addition, there is turbidity and the clearer the water is the
better the chance that you have filtered out impurities from a physical standpoint. Water can be
safe but have a taste and odor problem which is not liked by the community, so that is a focus
point.
Fleming said also, they are talking about getting rid of the backwash cycle. When you
filter
water, every day or two you have to backwash the filters by pushing clean water back up through
them to wash out all the dirt and material you have accumulated. In the past, the water has been
recirculated back to the head of the plant and re-treated again. EPA does not like that and wants
that recycle stream to go away. These are the primary water quality issues focused on at
Medicine Park.
A team of six staff members from CH2M Hill, as well as City staff members, had a workshop
session for several days at the treatment plant. They looked at alternatives that incorporated the
water sources, treatment and distribution, and looked at the aging condition of the plant and
assessed its condition; opportunities for rehabilitation and expansion were reviewed to see if they
could get the plant to perform more by spending a few dollars rather than building a new plant.
The major findings were that due to the age, condition and original design, they recommended
that the south head works and the filters be abandoned; these were built in 1932 and you can
rebuild them but the concrete box is only so big and it is not deep enough to get the filtration
depth needed for filter media to get the turbidity down and meet the standards. There are cracks
in the walls and four filters are out of service because if they are in service, water leaks through
the walls to the outside, so he did not recommend spending money to rehabilitate the filters in the
south portion and that it be abandoned. Electrical and instrumentation has been there since 1932,
or 1967 when it was rehabilitated, and some needs to be replaced. As the plant has grown,
components have been added and it is difficult for the operators to deal with the chemical storage
and hazardous waste containment and chemical storage are required, so the recommendation is to
centralize the chemicals and provide a maintenance facility. Those three things are the biggest
cost items whether you get any more capacity or not.
All of the alternatives included looking at the clarification, filtration and disinfection.
To get to
the 45, there would be 35 mgd at Medicine Park plus 10 mgd at a new plant; or, they would do
all 45 mgd at Medicine Park. The 45 mgd is the capacity of the treated water line from the plant
to town, so to go more than 45 mgd at Medicine Park would require a new transmission line all
the way from the plant to town, which would be a very costly item. The two overriding
alternatives that will be referred to are 35 mgd and 10 mgd or 45 mgd; under each one, they
looked at different process ways to achieve it. The clarification deals with the turbidity, or how
clear is the water, and they looked at three different oxidants; chlorine dioxide, ozone and
chlorine. Use of chlorine creates problems with THM's and chlorine dioxide and ozone have just
come into being in the last five years for that very reason. In all three cases they would use GAC
filters, granular activated carbon, which removes taste and odor. They developed alternatives and
the associated cost to be able to make a recommendation. At Medicine Park they looked at a high
rate clarification and membrane, so this is technical information but it shows how they outlined
the alternatives.
Benefits of having a second plant may not be cost related; it would be a backup and
redundant
source of water. Should there be damage to the water plant due to a storm, or damage to the
transmission lines coming to town, you could be out of water until that was repaired, so there is a
real benefit to a city this size, and cities this size start to have more than one plant normally. The
water can gravity flow from Ellsworth to the new plant site, whereas, now, to use Ellsworth
water, it must be pumped to Lawtonka for treatment, so it would be an advantage to have a
gravity flow for the raw water to a new plant. Also, it would be beautiful from a construction
sequencing standpoint because the new plant could be built and when it was on line, it could be
used and the Medicine Park plant could be rehabilitated much easier without as much risk. If you
build only at Medicine Park, you must be very careful not to disrupt the plant because it is the
only source.
Associated costs of a new plant would include additional staff, and it is not as efficient
to run
two plants as it is to run one. It is not just the plant costs and there would be a cost of at least
$7
million on one of the two needed pipelines just to connect the plant into the distribution system,
and it is close to five miles of 48" line into town for the connection, whereas that capacity
already exists at Medicine Park so that gives that alternative a real advantage. If there was a
southeast plant, the water would not be available to Fort Sill because it is uphill so there would
have to be an emergency pump station to pump from one zone upward, rather than the gravity
flow.
A slide was shown outlining operational impact and capital impact. If the south clarifiers
are
removed at Medicine Park, the water will have to be pumped up five feet to get to the north
clarifiers. There is an operational advantage of having one plant at Medicine Park, with the draw
back being the requirement to pump from Ellsworth to Lawtonka. Pump Station #4, between the
plant and town, currently pumps water 24 hours a day and it assists the east high zone.
Shanklin asked if the City has to pump only for the east high zone. Ihler said that
is what fills the
east tower but the water that gets to that pump station comes from the north high zone, which is
pumped from the plant. North, east, industrial and west zones are all pumped.
Fleming said the next slide presented the results of all of the factors and the cost
estimates.
Information was shown by capital costs, present worth and O & M; those were added for a total
project cost. The two alternatives are to bring Medicine Park to 35, plus a southeast plant; or
build it all at Medicine Park at 45 mgd, and the three technical ways to do that using chlorine
dioxide, ozone membranes, and two ways to get to 45, so there are five different alternatives
contained within two overall alternatives.
The cost to rehabilitate Medicine Park for 35 mgd, and then to build a second plant,
would be
$44, $52 and $56 million capital costs, which includes inflation, construction to the year 2002
and a contingency for engineering, legal, admin, and those costs. If this were only for 35 mgd at
Medicine Park, there would be no cost for the second plant. On a capital cost basis, it is easy to
see that you get 45 mgd at Medicine Park by spending $35.5 million capital, so that is the
conclusion as far as capital cost, and some alternatives have more or less operational costs
associated with them, so you do not make the decision based solely on capital costs, so we look
at operation and maintenance. The numbers are 20 years, discounted at 6%, so you discount the
annual O & M cost at 20 years at 6%, and it shows that chlorine dioxide costs a lot of money,
$14 million; ozone is an electrical power cost; you would add the capital plus the present worth
so this is what we normally make alternatives decisions on. It is obvious that the best way to go is
to have 45 mgd at Medicine Park.
Baker asked if O & M was total for those options or if it was additional. Baker
asked if the $8.6
million was in addition to what we currently budget for O & M and Fleming said yes, it is
additional cost.
Purcell asked if the $26.2 million on the new plant included the $7 million for the
transmission
lines and Fleming said yes. Purcell said if we need another 10 mgd in the year 2015 and have to
build a new plant and transmission lines at that time; is there an estimate of the cost for that time
period including inflation. Fleming said he had not calculated those costs. Purcell said if you
built the $26.2 million plant today, you would have the 10 mgd capacity available, and if you
needed to add another 10 mgd capacity, it would likely be at the southeast plant. Purcell asked if
those items should be considered for future generations, realizing that it is much cheaper to do
today; there is a $16 million differential today, but it might be $20 million for the next generation
and that may need to be considered for future planning to allow for a decision. Fleming said once
you exceed the 45 mgd at Medicine Park, the next expansion would be very expensive because
the transmission line will not be adequate and it would be a matter of economics at that time to
determine what should be done.
Shanklin said on many days, the 10 mgd capacity can almost carry the City. Graves said
12 mgd
is about the lowest usage experienced. Shanklin said we have run the City on the south plant
alone within the last two or three years for a couple of months at a time, and you can say 100,000
people but we are at the same population we were in 1990, give or take 3,000, and Fort Sill did
not add anything because they were receiving water anyway. Shanklin said the water taps do not
show a gain, although there has been a gain in the county. Shanklin said he could not support the
more expensive proposal if there is a $15 million difference.
Shanklin asked the time frame for the water project. Fleming said six to nine months
for design
and probably two years for construction at Medicine Park due to the phasing; January 2002
would be the mid-point for construction.
Baker asked Fleming if he could restate his recommendation based on the things that
had been
studied. Fleming recommended modification to the Medicine Park plant to produce 45 mgd using
the ozone technology, which is the lowest cost estimate in both capital and operations.
Mayor Powell asked how it would be constructed. Fleming said they would keep the south
plant
running until the work was finished in case there was a problem, and do the clarifiers in the north
part a section at a time. Shanklin asked if it would be five gallons per minute on clarification.
Fleming said it is five gallons per minute per square foot.
Mayor Powell asked about the cost of pumping from Waurika to Ellsworth and Fleming said
they
had not figured those costs since they did not select that alternative, and that unless there was an
emergency, there would not be a need for that water. Fleming said they would finish the report in
the next two or three weeks and would welcome any input that would be provided.
This concluded Fleming's presentation.
Steve Livingston, Finance Director, said the handout provided information on the funding
alternatives. He said the three funding alternatives available to cities were sales tax, ad valorem
tax and utility revenue, and information on each of these categories was provided as to how much
each would generate for the capital improvement programs.
Livingston said the 1-1/4% sales tax will terminate December 31, 1999, and sales tax
has been
the major source of income for capital improvement programs since the early 1970's. He said 1-1/4%
sales tax is estimated to generate $9 million, and if a five-year program is sought, it would
produce $45,450,000 not including any inflation or growth. Total sales taxes for the ten largest
cities in Oklahoma was included and most cities have 3% or above, except Edmond at 2.875%,
and Oklahoma City is 3.87%, so Lawton is competitive in that sales tax rate. Some cities have a
county sales tax, and Lawton now has a county sales tax of 1/4%.
Livingston said comparison information was also included on the ad valorem tax and that
Lawton has not received ad valorem tax since the early 1960's when Lake Ellsworth and other
improvements were done, other than placing judgments on the tax rolls for payment through ad
valorem taxes as allowed by statute, and Lawton is at 3.13 mil levy. One mil will generate
$254,000, and that is an important number in trying to determine how much the mil levies would
go up if some of the CIP were placed on the ad valorem rolls. Livingston said a 20 year bond
issue was shown for a general obligation bond for a program for a $1, 10, 20, 30 or 40 million
bond issue showing the highest and lowest mil levies. As an example, using a $100,000 fair
market value house for the first year, on a $1 million bond issue, it would be $4.50 per year for
the first year and $2.14 per year for the last year. Livingston said a $1 million bond issue for 20
years would cause 4/10ths of a mil and the last year would be 19/100ths. If it was a $40 million
20 year bond issue, the first year would be 16 mils, or $180.00 for the first year for a $100,000
fair market value home, and the last year would be 7.61 mils or $85.61.
Livingston said the alternatives and comparisons were provided to allow everyone to
think about
the best way to make a good decision. He said the last revenue source shown is utility revenue,
and $1 on a basic utility bill per customer will generate $400,000, and a comparison of the ten
largest cities in Oklahoma was provided regarding utility rate structures. Lawton is about seventh
out of the ten as far as the utility rates based on 10,000 gallons, which is not a basic amount.
Tulsa is the largest at $76; Edmond is $57; Enid is $56, and it gives an indication of the charges
around the state.
Mayor Powell asked if the current 3.13 mil levy should be added to the numbers shown
for
comparison and Livingston said yes.
Briefing on proposed capital improvements plan was given by Gary Jackson, Assistant
City
Manager.
Jackson said a staff committee composed of the Finance Director, Public Works Director,
Parks
Director, Planning Director, and himself, had met for the last two months going over what they
considered to be the major needs of the City of Lawton. The needs were listed and 21 projects
were listed and two programs, which are not actually CIP projects. He said the information is
shown as a suggestion and the projects are shown according to recommended priority.
Projects were as follows:
"2000 Capital Improvement Program
1. Landfill 5,000,000
2. Water Treatment
a. compliance requirements 15,000,000
b. capacity upgrade 20,000,000
3. Water Distribution 3,000,000
4. Water Pump Station No. 1 500,000
5. Eastside Park (Phase I) 1,500,000
Subtotal funded by sales tax $45,000,000
(1.25% for five years)
6. Fire Station Relocation 1,300,000
7. Water Distribution 3,000,000
8. (Greer) 34th St./Drainage 3,500,000
9. Major Arterials (matching amount):
a. NW 38th ($1 to $1.6 mill.)
Cache Rd. to
Rogers Ln. 1,600,000
b. Flower Md. ($1.8 to 2.8 mill.) 2,800,000
Gore to Rogers
Ln.
Subtotal funded by Ad Valorem: $12,200,000
(20 year mill levy)
Subtotal: All funded Projects $57,200,000"
Jackson said the water plant is very important and a decision is needed in a timely
manner;
however, we are approaching the life of the existing landfill cell quicker. Two to three years of
life are left in cell number one, therefore, we need to move forward on the design and
construction of cells two and three. Industrial contributions to the landfill may cause this to
happen quicker, but it could be from two to four years, and estimated construction for the landfill
is $4.5 million for Subtitle D standards, as well as a maintenance building for $400,000, and a
master plan for $200,000. The master plan would include all of the property owned by the City,
how it would be used and the timing of its usage over the life of the facility, and not just the
currently permitted area. Shanklin asked if $200,000 was needed for a master plan. Ihler said that
was their best estimate.
Purcell said about a year ago they were told the landfill had a remaining life of approximately
eight to ten years. He asked what happened to make it two to three years now. Ihler said the
permitted landfill site is eight to ten years, but that includes cells two and three, which have not
been constructed or lined, etc. Purcell asked if the FAA would be involved as it would with a
new landfill and Ihler said no. Beller asked for a copy of the information on the landfill master
plan. Ihler said it would include the aerials that need to be taken and information about moving it
to the south and getting a DEQ permit for future space.
Jackson said the water plant costs are broken out into upgrade and compliance requirements.
He
said in the two-page summary, a total of $10 million is included for water distribution needs and
it is broken into various funded and unfunded programs. Jackson said nothing is funded but the
scenario projects everything shown to be funded through sales tax and ad valorem tax, and the
other sheets include needs for which a funding source is not identified. Mayor Powell asked if
water distribution was for repair and maintenance and Jackson said that is correct, repair and
replacement of existing water lines throughout the distribution system. Ihler said it also includes
the lines shown in a report which will be provided concerning fire hydrants. Shanklin said the
people should understand that these costs are a very small part of the overall need with regard to
replacement of water lines.
Jackson said the Pump Station No. 1 project is in the industrial area, and when Republic
comes
on line, that pump station will be at 92% capacity, therefore, staff feels the pumps should be
changed out and upgraded. Williams asked if funds for that pump station upgrade could be
secured through a grant. Mayor Powell said a grant is being sought for that purpose but that they
could not count on that grant funding; the City has made application through ASCOG. Baker said
the application would be made through ASCOG to EDI and it can be justified due to the
importance of that pump station to the industries in the west part of town. Baker said we do not
know if the funds will be received and this is a priority item; if an EDI grant is received, and
funds remain, Council can reprogram them. Mayor Powell said other grants had been applied for
also.
Jackson said the Eastside Park, Phase I, is also included as a need; this would not
be fully
developed during Phase I and would primarily include five, lighted youth baseball/softball fields,
restrooms, parking lot, road and sprinkler system, for $1.5 million and the land has already been
acquired.
Shanklin asked how much of the cost is for dirt work and how the $1.5 million figure
was
determined. Gary Salva, Parks & Recreation Director, said it was based on other comparisons
with similar facilities. Shanklin said someone should know how much dirt work is involved.
Purcell said the fields were to replace those behind Shoemaker Center, thinking that a school
would be built in that location. Shanklin said the fields at 17th and G may not be available much
longer and Purcell said that would make the problem worse. Shanklin said he would hate to see
the City spend $1 million on dirt work.
Salva presented a conceptual drawing of the Eastside Park prepared by Oklahoma University
students. He said the area can definitely accommodate five fields and a parking lot, and noted the
project by the University was provided to the City free of charge. Salva stated the area would
require landscaping and that location of certain facilities shown by the students should be
changed.
Jackson said the projects discussed so far could be funded through the 1.25% sales tax
for five
years, if so desired and approved.
Jackson said the next set of projects could be funded through a $12.2 million ad valorem
levy. He
presented an aerial photograph of Fire Station #5, pointing out that it is located at an intersection
causing problems for the trucks to enter and exit the station and backing up traffic. The building
itself has shifted and has structural problems. $850,000 is shown for construction and $1.3
million to acquire the land as an exact location may be on already developed property, although
the exact location is not shown. Mayor Powell stated the property at 53rd and Gore may have a
pretty good market value that could result in some income if it is no longer needed.
Jackson said the next project shows another $300,000 in water line improvements, followed
by
the 34th Street Reconstruction and Drainage Project for $3.5 million. Shanklin said this was
included in a prior CIP at a much smaller cost as the scope of the project was not realized, but the
improvement has been needed for a long time. Jackson said this estimate combines both the
street and drainage work that is needed.
Jackson said four arterials are included, two in the portion shown as ad valorem funding,
and two
in the unfunded portion. He said that is not to say that any of the projects are not important.
Jackson said the numbers shown are matching amounts for projects which ODOT may fund if the
City can provide the matching amounts. He said it may take eight to ten years to do the projects.
Flowermound does not include the one mile that Council has already applied for grant funding to
construct.
Purcell said they started out talking about five miles total; three miles from Lee to
Rogers Lane
on Flowermound and two miles to the highway, and it was $2 million per mile or $10 million for
the five miles, and the City had to match 20%. He said he understood it was a $2 million local
match for the five miles, but now we will do four miles and the match is $5.6 million. Purcell
asked what had changed. Ihler said for ODOT projects they use about $750,000 to $800,000 per
lane per mile, and this is four lanes; they had been using $3 million per mile for a four lane
highway as an estimate. Four miles would be $12 million, and the amount of drainage work
required is a variable amount. Ihler said matching amounts required have been from low range
25% to high range 40% based on engineering, design, utility relocation, and right of way
acquisition. Purcell said he had been told by State personnel that the matching amount was 20%.
Ihler said the program may be such that the local percentage of cost for construction may be
20%, but in addition to that, there are the other items.
Jackson said Items 10 through 19 are not shown with a funding source.
Purcell asked what $12.2 million would equate to in mils for ad valorem. Jackson said
it would
be 4.8 mils. Mayor Powell said that would be 7.93 mils total. Jackson said it would come out to
$54 a year for a $100,000 house. Baker said the reason we listed $12 million in projects under ad
valorem was so it would not go over five mils because the cost to the property owner appeared to
be reasonable.
Shanklin asked if 50% of the vote was required to pass ad valorem for the City or if
it was 60%
for the School or the City. Vincent said he thought it was also 60% for the City and that he would
check on it and provide a report.
Baker said staff had not identified funding for the additional items on the list and
there are
probably $250 million in projects that could have been brought to the Council, but it would have
made the process more complicated. Items 20 and 21 are not capital improvement projects but
they are items which Council members had mentioned to him over the last several months as
needs of the community; one is public transportation. Baker said the last official action of the
Council on public transportation was to look at that as a separate issue on the ballot when the
CIP was voted on and that he could check further on that. Baker said the other item that had been
mentioned was that we may want to try to do something for economic development. He said
these are noted if Council desires to do anything with them.
Mayor Powell said he would call on Vincent for a briefing on statutory deadlines.
Vincent said the Election Board has established three election dates for the remainder
of 1999.
The first possible election date we can meet for this type of election, and other kinds of elections
would have different dates, but the first possible election date for this type of election is October
12. The deadline to have all of the items to the Election Board is August 12. The next date is
November 9, with a deadline to the Election Board of September 9, and the last date this year
was December 14, with a deadline of October 14.
Shanklin said if we are going to go out for ad valorem taxes, we should go after it
with teamwork
with the School Board. He said that is the School Board's historical funding and they have not
passed one in probably twenty or twenty-five years, and the City has not tried to pass one in
thirty years or more. Shanklin said if the School Board is going to come with a program, and we
place them together, there would be a better chance than each one going by themselves and we
could be a little bit more ambitious than five mils on the City's part because we are at 70 mils and
that matches any place in southeast Oklahoma as far as millage rates. He said we want to
compare ourselves to other progressive cities and you will see that their millage is almost twice
that of Lawton; Edmond is 128 mils. Shanklin said a $100,000 house in Lufkin, Texas, is $2,200
ad valorem taxes and the various taxes they collect. Shanklin said he
felt strongly that the City should look at putting a package together with the School Board to
submit on the ad valorem and sell this together and he asked for comment from Council.
Purcell asked if Shanklin was suggesting the City get together with the School Board
and figure
out how much in mils is needed for what the City needs to do and how much the School Board
needs for what it needs to do. Shanklin said yes, and put them together on the same ballot.
Purcell said he agreed it would be good to get together with the School Board and work this out
but that he did not want to have an election where on the same day the people were voting for the
City and the School Board, and that it would not do either group any good. Shanklin said they
would both fail if they were not done together. Purcell said he thought they would both fail if
they were put together because you have two different groups and two different sets of things.
Purcell said he agreed the City should get with the School Board and figure out how much each
one wants. Shanklin said if you have two different groups, and both are pushing for passage, it
would be an advantage over having just one group. Purcell said he thought it would be an
advantage to get with the School Board and determine how much each entity needed but that he
did not support putting them on the same election day, even if that is possible.
Mayor Powell said he hoped they could think these things out a little bit and not arrive
at a
conclusion this evening, and that the comments are appreciated. He said he would agree 100%
and that he had talked to Mr. Beauchamp and we could work jointly with them in some manner
because there is a great need for the schools, as there is a great need for the City, so he hoped that
some kind of decision would not be reached but to wait and think it out a little bit and come back
at a future meeting.
Williams said he knew the number one priority would be to ask the citizens to adopt
the Year
2000 five-year capital improvement 1-1/4 cent sales tax. He said he doubted that an ad valorem
issue would pass, even though there are such tremendous needs, and that the only other
alternative after that is the utility bill. Williams said he felt the utility bill would have to be
impacted to allow the City to move forward. Shanklin said the utility bill did not have to be
impacted and Williams said the revenue is needed for the projects. Shanklin said they could sell
to the taxpayer what the problems are, both on the School Board side and on the City side.
Williams said he felt the taxpayers knew what the problems were and Shanklin disagreed. Mayor
Powell said if we put together a good program, and the schools are included, and we are able to
communicate with our public and educate our public as to what the needs are out there, he
believed firmly that the ad valorem would pass. Mayor Powell said he knew the School District
the last time came within about 2-1-/2 percentage points of passing that super majority, and less
than that on the bus issue, and the more people they talked to, the closer they got to passing the
issue, and that he believed strongly that we could pass this. Shanklin said you just need another
push and that would be the City of Lawton on that program and Mayor Powell agreed.
Mayor Powell asked if Council had enough information to study for a little while. Warren
asked
when the next meeting would be and Mayor Powell said he would get with them and see what the
most congenial date would be, and they could take some time and look at the things that had been
brought to them. Mayor Powell said he appreciated the work and study done by the staff.
Beller asked about time constraints as far as elections and if priorities should be
addressed.
Mayor Powell said staff brought the study forward and it is up to Council to prioritize it and see
what they wanted, and that he felt October would too early, and that Council would have to meet
and establish the priorities and then after that, they would have to have not a sale job, but an
education job and a communication job with the entire Lawton-Fort Sill community, and that
does not give much time if you look at an October date, and less time for the school people who
are trying to get organized for the school year, and that December would be too late and people
are spending money for Christmas at that time, so he would like for Council to think about a
November election date. Mayor Powell asked if that had to be decided tonight. Shanklin said no,
but he thought it would be done in November.
Shanklin said he thought the Mayor needed to see to it that a group of Council people
would
meet with the School Board, and that the Mayor had talked with Barry Beauchamp but that he
had not talked to his board. Mayor Powell said he asked one question and one question only and
that Beauchamp could not speak on behalf of the board at that time. Shanklin said he brought it
up so it could be put out before the public right now and try to promote a program, and that each
could go their separate way and die or survive, but teamwork would be an advantage. Mayor
Powell said he would do as Shanklin had suggested regarding meeting with the School Board.
COMMENTS
Mayor Powell encouraged attendance at the Limousine Cattle Show being held at the Great
Plains Coliseum and expressed appreciation for the group holding this event in Lawton.
Mayor Powell said he met briefly this morning with the President of ASA Airlines at
the Lawton
Airport. He said Dorice Shanklin and Mr. Joiner were also there getting ready for a meeting, but
the President was only at the Airport for an hour. Mayor Powell said he heard about it at 9 p.m.
last night so he made sure he was out there and it was fantastic.
Mayor Powell said the official announcement was made today, and practically all of the
dignitaries were present from Southwest Oklahoma and the Governor's office at Flowermound
and Gore, for the announcement of the VA Center being a reality, and that he anticipated ground
would be broken and construction started within a year.
Baker asked if Council would like any further information on the CIP prior to the next
meeting.
Shanklin said staff had done a good job.
There was no further business to consider and the meeting adjourned at 6:40 p.m.